|
General Features |
Lite |
Full |
|
Estimates are stored in a robust relational
database |
Yes |
Yes |
|
Automatically saves your data |
Yes |
Yes |
|
Backup database function |
Yes |
Yes |
|
User definable drop down menus |
Yes |
Yes |
|
Install on a PC/laptop, LAN, Windows
Terminal Server and Citrix |
Yes |
Yes |
|
Full multi-user; you can even have a team
working on the one estimate at the one time
(requires multiple licenses) |
Yes |
Yes |
|
Administration function so you can control
functionality and default settings |
Yes |
Yes |
|
Project Browser function which lists all
your estimates in your database and allows
you to easily search for and open previous
Projects |
Yes |
Yes |
|
Quickly view Tenders due today, this week,
next two weeks or within the next month |
Yes |
Yes |
|
Project and Resource Notes and text fields
for Project Comments, Documentation,
Deliverables and Scope |
Yes |
Yes |
|
Check Out / Check In allows you to work
remotely on an individual estimate or
estimates if you cannot connect to your
master database via your network |
Yes |
Yes |
|
Ability to add links to documents (photos,
specifications, drawings etc) within a
Project and to Items in your Item Library |
|
Yes |
|
Libraries |
Lite |
Full |
|
Control access to Libraries on a user by
user basis |
Yes |
Yes |
|
Resource Library stores your standard
Labour, Plant, Material and Subcontract
rates |
Yes |
Yes |
|
Item Library stores the standard services
you provide. An Item (also known as an
activity or recipe) is made up of a
collection of Resources |
Yes |
Yes |
|
Section Library stores your standard Section
headings (i.e. main headings/breakdown for a
standard job you do) |
Yes |
Yes |
|
Client Library stores your client's details |
Yes |
Yes |
|
Subcontractor Library stores your
subcontractor’s and supplier’s details |
Yes |
Yes |
|
Conditions Library stores your standard and
project specific conditions that can be used
on your quotes |
Yes |
Yes |
|
Estimator Library allows you to create user
profiles including login code, password,
contact details, system access permissions
and quote authorisation levels |
Yes |
Yes |
|
Takeoff Sheet Library stores your quantity
takeoff templates, which can be used to work
out quantities for Items in a project |
|
Yes |
|
Variable Library stores your common
variables (parameters) that you wish to
amend on a job by job basis (e.g Wastage for
Pipe %, Wastage for Concrete %, Hours per
Day) |
|
Yes |
|
Estimating YOUR PROJECT |
Lite |
Full |
|
The ability to add Sections, Items and
Resources from your libraries, and be able
to edit this information within the estimate |
Yes |
Yes |
|
The ability to add project specific
Sections, Items and Resources to your
estimate |
Yes |
Yes |
|
The ability to load a Bill of Quantities
(schedule of items) from a spreadsheet, and
save your bid (submission) rates
electronically into the original spreadsheet
file |
Yes |
Yes |
|
Allocate Resources from Item Library -
gives you the ability to allocate one or
many Items from your Item Library to a
single Item in a Project |
Yes |
Yes |
|
Section Production Rates to quickly and
accurately change the production rate for
all Items in a Section |
Yes |
Yes |
|
Item Production Rates to quickly and
accurately change the production rate of an
Item |
Yes |
Yes |
|
Resource Production Rates to quickly and
accurately change the production rate for a
user- definable group of Resources within an
Item |
Yes |
Yes |
|
Item and Resource Calculator function –
calculate quantities of Items and Resources
with Benchmark’s powerful calculator.
The calculations you enter (which can
include text strings) are saved with your
estimate and can be printed out on your
internal reports. |
Yes |
Yes |
|
Resource Factor feature to specify a
secondary factor for a Resource (for example
if you purchase Steel at a per metre rate,
you can specify a weight per metre –
Benchmark can then calculate for you the
total weight of Resources in your Project) |
Yes |
Yes |
|
Plugged function allows you to see which
Resources are “plugged” (or guessed) for a
Project |
Yes |
Yes |
|
Complete function so you can keep control
over which Sections and/or Items you have
finished estimating, and also so you can
“lock” your estimated price |
Yes |
Yes |
|
Ability to duplicate entire estimates, and
set up standard project templates that can
be duplicated and edited |
Yes |
Yes |
|
Rate Only Items and Provisional Sum Items |
Yes |
Yes |
|
Resource Level Sub Totals, Group Totals,
Text and Bold Text lines. Item Text
lines. |
Yes |
Yes |
|
Cartage Calculator can automatically
calculate the cost of Cartage for specific
Resources based on a Cartage Rate, Cartage
Distance, Flag Fall and Distance Included |
Yes |
Yes |
|
Cost Check - updates previous estimates with
current rates from the Resource Library
|
Yes |
Yes |
|
Add Variations to projects |
Yes |
Yes |
|
Routines for pricing repetitive works by
answering user definable questions.
Routines can price an entire Project or
individual Items within a Project. |
Yes |
Yes |
|
Sub Items (composite resources) can be added
to an Item as an individual Resource but can
themselves be made up of many Resources.
Ideal for crews, assemblies or breaking down
your items of Plant into more detail (e.g.
Fuel, Operator etc). |
|
Yes |
|
Subcontractor Manager – issue requests for
prices and import quotations from
Subcontractors or Suppliers electronically.
Compare quotes in a comparison screen and
automatically update your estimate with your
selected subcontractor/supplier. |
|
Yes |
|
Calculate Quantities of Items in your
estimate using standard takeoff sheet
templates. These templates are set up
in a spreadsheet and the resultant takeoff
calculation is stored seamlessly with your
estimate |
|
Yes |
|
Auto Allocate bids schedules of items (or
bills of quantities) with amazing speed and
accuracy |
|
Yes |
|
Resource Rate Change allows you to view all
resources used in your estimate in one
screen and make project specific rate
changes, without changing the default rate
in the Resource Library. You can make
changes by rate or %. |
|
Yes |
|
Variables allow you to edit key,
user-definable parameters like a Density or
Wastage %, and this will flow through to all
appropriate calculations in your estimate
automatically. You can also use it to
designate depths, widths, heights, areas at
several levels of an estimate. Your
Variables can be used in your Item and
Resource quantity calculations. |
|
Yes |
|
Power Routine for bidding annual and
longer-term maintenance contracts |
Optional add-on |
Optional add-on |
|
Allocating Profit, Overheads and
Contingencies |
Lite |
Full |
|
Extras screen for allocation of your project
Markup, Overheads and Contingencies; these
can be applied as %’s or lump sum amounts.
You can apply different Markup % to your
Labour, Materials, Plant and Subcontract
components or break it down even further by
Resource Group (Concrete, Steel etc). |
Yes |
Yes |
|
Overhead Sections (ideal for Site Overheads
and Project Management) which are spread
across your direct cost (bill) items and not
displayed on your Quote |
Yes |
Yes |
|
The Spread function allows you to manipulate
your submission rates on an item by item
basis. You may wish to “front-load”
your tender to increase cash flow early on
in your Project for example. |
Yes |
Yes |
|
Reporting - General |
Lite |
Full |
Over 70 Direct Cost reports including a
project summary, bill of quantities, list of
materials, detailed resource listings per
item, resource listings per group and cost
code, and resource usage sorted by cost and
quantity
|
Yes |
Yes |
|
Resources by Item with Options report with
many user-defined options to enable you to
produce a handover report for your contract
manager in the format you want |
Yes |
Yes |
|
My Reports menu to set up your most commonly
used reports in the one easy to access menu |
Yes |
Yes |
|
Reports can be viewed on screen prior to
printing, saved to HTML and copied and
pasted into Word or Excel |
Yes |
Yes |
|
Compatible with external reporting systems
including Crystal Reports and Cognos |
Yes |
Yes |
|
Reports can be generated as a PDF document
(excluding Word and Excel documents) |
|
Yes |
|
Quotes, Quoting and Follow Up |
Lite |
Full |
Quote Submission reports including
Quotations, Rate Only Quotations, Schedule
of Rates and a Tender Letter
|
Yes |
Yes |
Ability to include your company logo and
standard and project specific conditions in
your Quote reports
|
Yes |
Yes |
Quote with Options report with many
user-defined options to quickly produce a
quote in your required format
|
Yes |
Yes |
Microsoft Word® templates allow you to set
up standard template(s) for your standard
Quote submission formats. For a Project you
simply select which format you wish to use
and Benchmark populates the template
automatically with the relevant details from
the estimate
|
|
Yes |
|
Quote Authorisation process flow to notify
Managers when a quote needs their
authorisation |
|
Yes |
|
Follow Up feature to remind your estimators
which quotes need to be followed up on each
day. Includes a Follow Up Summary
report which gives information on the Follow
Up performance of your Estimators |
|
Yes |
|
Email (as a PDF) your quotes directly from
your Benchmark estimate to improve quote
turnaround time and help you win more work |
|
Yes |
|
Email Log logs all emails issued from
Benchmark and saves quotes and reports
attached as PDFs; ideal for auditing and to
quickly view quotes emailed to clients |
|
Yes |
|
Marketing and Business Reporting |
Lite |
Full |
|
Business reporting including Items by Market
Share, Projects by Estimator, Quote KPI per
Estimator and Winner Not Registered |
Yes |
Yes |
|
Update Marketing Data window so you can view
and update Marketing data for all Projects
from one single window |
|
Yes |
|
Marketing Analysis graphs (won/lost/pending,
reason for loss, competitor comparison,
forward order) |
|
Yes |
|
Export all marketing data direct to a
spreadsheet for your own analysis |
|
Yes |
|
Exports to Excel |
Lite |
Full |
Resources by Cost Code for budgets, project
management and integrating with other
systems
|
Yes |
Yes |
|
Resources by Subcontractor/Supplier for
ordering |
Yes |
Yes |
|
Resources by Item with Used and Remaining
and Project Total Resources by Group for job
costing |
Yes |
Yes |
|
Project Review/Analysis for job costing and
what-if analysis by contract managers |
Yes |
Yes |
|
Schedule of Items |
Yes |
Yes |
|
Interfacing with Other Business Systems |
Lite |
Full |
|
Exports to other business systems being
Projection Scenario, Microsoft Dynamics
(Navision), Timberline and JobPac |
Yes |
Yes |
Open Database Connectivity (ODBC) Driver so
other systems can access and extract data
from your Benchmark data file(s)
|
Yes |
Yes |
Import (and export) facilities allow you to
electronically import Resource rates (price
lists), Clients and other data into your
Benchmark data file
|
Yes |
Yes |
|
Standard MPX export to Microsoft Project,
Suretrak and Primavera |
Yes |
Yes |
|
Resource-based export to Microsoft Project
for project scheduling, cash flow
forecasting and resource planning (requires
Microsoft Project 2003 onwards) |
Optional add-on |
Optional add-on |
|
Progress Claims |
Lite |
Full |
|
Generate Progress Claims directly from your
Benchmark project. Includes ability to
do your claims by % or Quantity complete and
Retentions. Five different Progress
Claim reports including a one-page Summary
(cover sheet), detailed reports by Item, a
Claim Report with Options so you can
customise the format of the report, and a
report showing the data for the last four
claims.
|
Optional add-on |
Yes |
|
Support and Documentation |
Lite |
Full |
|
12 months of upgrades to the software |
Yes |
Yes |
|
12 months of 24/7 support from our helpful
and experienced support team |
Yes |
Yes |
|
Comprehensive hard copy full-colour User
Manual |
Yes |
Yes |
|
Online Help |
Yes |
Yes |