|
Summary of Benchmark’s Main Features
|
|
General features and benefits |
lite |
full |
|
Easy to use |
Yes |
Yes |
|
Central database |
Yes |
Yes |
|
User definable codes |
Yes |
Yes |
|
Automatically saves your estimate data |
Yes |
Yes |
|
Windows based |
Yes |
Yes |
|
Project Browser which lists all your
estimates/quotes and allows you to easily
find previous jobs: includes a Quick Find
feature to search by Quote Number, Title,
Estimator, Client, and more |
Yes |
Yes |
|
Central libraries of data |
lite |
full |
|
Resource Library for your Labour, Plant,
Material and Subcontract costs |
Yes |
Yes |
|
Item Library for the build-ups of your
standard services and/or products. An
Item (sometimes known as an activity or
recipe) is made up of a collection of
resources |
Yes |
Yes |
|
Section Library to store your standard
Sections (work breakdown structure) |
Yes |
Yes |
|
Client Library for your client's details |
Yes |
Yes |
|
Subcontractor Library for your
subcontractor’s and supplier’s details |
Yes |
Yes |
|
Conditions Library for your standard and
special conditions that can appear on your
quotes |
Yes |
Yes |
|
Estimator Library for your Benchmark users’
login, password and access levels, and other
details |
Yes |
Yes |
|
Takeoff Sheet Library to store your standard
quantity takeoff sheets |
|
Yes |
|
Estimating your Direct Costs – standard
features |
lite |
full |
|
The ability to add Sections, Items and
Resources from your libraries, and be able
to edit this information within the estimate |
Yes |
Yes |
|
The ability to add project specific
Sections, Items and Resources to your
estimate |
Yes |
Yes |
|
Copy and paste Sections and Items from one
estimate to another
|
Yes |
Yes |
|
The ability to load a Bill of Quantities
(schedule of items) from Excel, and save
your bid (submission) rates electronically
into the original Excel file |
Yes |
Yes
|
|
Allocate - gives you the ability to
allocate one or many Items from your Item
Library to an Item in a Project |
Yes |
Yes |
|
Section Production Rates to quickly and
accurately change the production rate for
all Items in a Project |
Yes |
Yes |
|
Item Production Rates to quickly and
accurately change the production rate of an
Item |
Yes |
Yes |
Resource
Production Rates to quickly and accurately
change the production rate for a user-
definable group of resources within an Item
|
Yes |
Yes |
|
Variables for designating depths, widths,
heights, areas, densities, etc. at several
levels of an estimate which can then be used
in your Item and Resource quantity
calculations (see next point) |
|
Yes |
|
Item and Resource Calculator function –
store calculations (including text strings)
with your Items and Resources. You can
add the Item Quantity, Production Rate, Crew
Size and/or Variables to your calculations.
When you change these in your estimate, your
calculations are automatically updated |
Yes |
Yes |
|
Complete function so you can keep control
over which Sections and Items you have
finished estimating |
Yes |
Yes
|
|
Ability to duplicate entire estimates and
set up standard project templates |
Yes |
Yes |
|
Rate Only Items and Provisional Sums Items |
Yes |
Yes |
|
Small Job Factor |
Yes |
Yes |
|
Cartage Calculator |
Yes |
Yes |
|
Cost Check - updates previous estimates with
current rates from the Resource Library in a
matter of seconds |
Yes |
Yes |
|
Variations |
Yes |
Yes |
Estimating your Direct Costs -
power estimating features
|
lite |
full |
|
Routines for pricing repetitive works
consistently and accurately |
Yes |
Yes |
|
Sub Items (composite resources) |
|
Yes |
|
Subcontractor Manager – issue requests for prices
and import quotations from Subcontractors
electronically. Compare quotes in a
comparison screen and automatically update
your estimate with your selected
subcontractor |
|
Yes |
|
Perform Quantity Takeoff’s in your estimate
using one of your takeoff sheet templates
from the Template Sheet Library or by
creating project specific takeoff sheets.
Benchmark stores these takeoffs in your
estimate |
|
Yes |
|
Auto Allocate – bid schedules of items over
52.5% faster, whilst retaining consistency
and accuracy, with this amazing feature |
|
Yes |
|
Resource Rate Change—in the one screen you
can view all resources used in your estimate
and make project
specific price changes without changing the
default rate in the Resource Library. You
can make changes by rate or %, and search by
subcontractor/supplier |
|
Yes |
|
Power Routine for bidding annual and
longer-term maintenance and facilities
management tenders
|
option |
option |
|
Estimating your Indirect Costs |
lite |
full |
|
Extras screen for allocation of your project
Markup, Overheads and Contingencies |
Yes |
Yes |
|
Overhead Sections (ideal for Site Overheads
and Project Management) that are spread
across your direct cost (bill) items |
Yes |
Yes |
|
Manipulate your submission rates on an item
by item basis in the Spread screen |
Yes |
Yes |
|
Estimate reporting |
lite |
full |
|
My Reports menu to set up your most commonly
used reports in the one, easy to access menu |
Yes |
Yes |
Submission reports including Quotations,
Rate Only Quotations, Schedule of Rates and
a Tender Letter
|
Yes |
Yes |
Microsoft WordŽ quote reports so you can
customise your company’s quote format in a
Word document
|
|
Yes |
Quote with Options report with many
user-defined options
|
Yes |
Yes |
Exports to Excel—Export key data into
Microsoft ExcelŽ, with reports such as
Resources by Cost Code, Resources by
Subcontractor/Supplier, Project
Review/Analysis, Resources by Item and
Schedule of Items
|
Yes |
Yes |
Direct Cost reports including a project
summary, bill of quantities, bill of
materials, detailed resource listings per
item, resource listings per group and cost
code, and resource usage sorted by cost and
quantity
|
Yes |
Yes |
|
Resources by Item with Options report with
many user-defined options |
Yes |
Yes |
Overhead Section reports
|
Yes |
Yes |
|
Reports can be viewed on screen prior to
printing, saved to HTML and copied and
pasted into Word or Excel |
Yes |
Yes |
|
Reports can be generated as a PDF document
(excluding Word and Excel documents) |
|
Yes |
|
Compatible with external reporting systems
including Crystal Reports and Cognos |
Yes |
Yes |
Marketing Analysis, Follow Up and Integrated
Email/Fax
|
lite |
full |
|
Dynamic Marketing Analysis reports
(won/lost/pending, reason for loss,
competitor comparison, forward order
reporting) |
|
Yes |
|
Follow Up feature to remind your estimators
which quotes need to be followed up on each
day
|
|
Yes |
|
Email (as a PDF) or fax your quotes directly
from your Benchmark estimate to improve
quote turnaround time and help you win more
work |
|
Yes |
Interfacing with other business systems
|
lite |
full |
|
Standard export to Microsoft Project,
Suretrak and Primavera |
Yes |
Yes |
|
Exports to your other business systems like
Projection Scenario, Oracle, Timberline and
Microsoft Great Plains |
Yes |
Yes |
|
Resource-based export to Microsoft Project
(2003) for project scheduling, cash flow
forecasting and resource planning |
option |
option |
Cost Codes and Cost Code exports to
Microsoft Excel
for importing into other systems
|
Yes |
Yes |
ODBC Driver so other systems can access and
extract Benchmark's data
|
Yes |
Yes |
Import facility allows you to electronically import
Resource rates (price lists), Clients and
other data into your Benchmark data file
|
Yes |
Yes |
Progress Claims (Valuations)
|
lite |
full |
|
Generate fast and accurate Progress Claims
directly from your estimate to save time and
eliminate retyping of data. Do your claims
by % or Quantity complete |
option |
Yes |
|